The calculations of the strength,stiffness and steamtight are very importang when high pressure and intermediate pressure casing of 300 MW steam turbine are designed.
本文采用三维弹性论,建立300MW汽轮机高中压外缸的有限元模型,进而计算了汽缸的度场、应力和变形。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。
Wang has worked in nuclear energy technology for decades, presiding over the research, design, construction and operation of China's first 5 mW Low Temperature Nuclear Heating Reactor (NHR-5) and the nation's first 10 mW High Temperature Gas-Cooled Reactor (HTR-10).
他在先进核能技术研发领域几十年耕耘,主持研究、设计、建造、运行成功国第一座 5MW 壳式一体化低温核供热堆以及第一座 10MW 模块式球床高温气冷实验堆。