The basic principle is the VCA formed by the coarse aggregate is filled with the fine aggregate, the filling, the asphalt and the preconcerted void content.
其基本原理为:矿料级配中粗集料形成由细集料、填料、沥青和预定填充。
The basic principle is the VCA formed by the coarse aggregate is filled with the fine aggregate, the filling, the asphalt and the preconcerted void content.
其基本原理为:矿料级配中粗集料形成由细集料、填料、沥青和预定填充。
声明:以上句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件观点;若发现问题,欢迎向我们指正。