The auxiliary shaft topsoil adopted ordinary construction and drainages in hygrometric well.
屯留煤矿副井井筒土段采用普通法施工,利用井外水井疏干水。
The auxiliary shaft topsoil adopted ordinary construction and drainages in hygrometric well.
屯留煤矿副井井筒土段采用普通法施工,利用井外水井疏干水。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其达内容亦不软件的观点;若发现问题,欢迎向我们指正。