The whole process of breakwater riprapping construction was monitored by the prototype monitoring device buried in the sand soft nappe.
摘要通过埋设在砂肋软体排上的原形观,对防浪围堤抛石施工过程进行了程监。
The whole process of breakwater riprapping construction was monitored by the prototype monitoring device buried in the sand soft nappe.
摘要通过埋设在砂肋软体排上的原形观,对防浪围堤抛石施工过程进行了程监。
声明:以上例句、词性分类均网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。